{"id":11681,"date":"2019-09-13T15:17:34","date_gmt":"2019-09-13T15:17:34","guid":{"rendered":"http:\/\/www.echos-senegal.com\/?p=11681"},"modified":"2019-09-13T15:17:35","modified_gmt":"2019-09-13T15:17:35","slug":"senelec-powership-120-megas-watts-disponibles-en-octobre","status":"publish","type":"post","link":"https:\/\/www.echosenegal.com\/?p=11681","title":{"rendered":"SENELEC- Powership:  120 m\u00e9gas watts disponibles en Octobre"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">La direction g\u00e9n\u00e9rale de la Senelec est en train de prendre les devants pour renforcer la production avant le mois d&rsquo;octobre 2019. Il s&rsquo;agit de la strat\u00e9gie du plan de production de la Senelec pour pallier le d\u00e9ficit, et c&rsquo;est la soci\u00e9te turque Powership (FRSP) qui a \u00e9t\u00e9 choisie pour la production de 120 m\u00e9gas watts, qui seront mise en service en octobre 2019. La mise en service du Powership est pr\u00e9vue dans la premi\u00e8re semaine d&rsquo;octobre, qui avec le d\u00e9but de la pointe annuelle de la Senelec. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Selon les sources bien introduites, le fonctionnement retenu est de trois mois, au HFO, er 5ans au gaz, pour 120 MW. Il faut relever que ce projet va permettre \u00e0 ladite soci\u00e9t\u00e9 de faire face \u00e0 l&rsquo;indisponibilit\u00e9 des 115 MW de Sendou, centrale \u00e0 l&rsquo;arr\u00e9t et qui ne reviendra pas d&rsquo;ici deux vois trois ans. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Pour la source, le choix du directeur g\u00e9n\u00e9ral de la Senelec vont permettre d&rsquo;\u00e9conomiser 6 milliards de FCFA par an pour l&rsquo;entreprise. Aussi, elle pourrait \u00eatre plus importante, si la Senelec prolonge le contrat sur 15 ans.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">avec dakartimes<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>La direction g\u00e9n\u00e9rale de la Senelec est en train de prendre les devants pour renforcer la production avant le mois d&rsquo;octobre 2019. Il s&rsquo;agit de la strat\u00e9gie du plan de&hellip; <\/p>\n","protected":false},"author":1,"featured_media":11682,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4],"tags":[],"class_list":["post-11681","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-economie"],"_links":{"self":[{"href":"https:\/\/www.echosenegal.com\/index.php?rest_route=\/wp\/v2\/posts\/11681","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.echosenegal.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.echosenegal.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.echosenegal.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.echosenegal.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=11681"}],"version-history":[{"count":1,"href":"https:\/\/www.echosenegal.com\/index.php?rest_route=\/wp\/v2\/posts\/11681\/revisions"}],"predecessor-version":[{"id":11683,"href":"https:\/\/www.echosenegal.com\/index.php?rest_route=\/wp\/v2\/posts\/11681\/revisions\/11683"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.echosenegal.com\/index.php?rest_route=\/wp\/v2\/media\/11682"}],"wp:attachment":[{"href":"https:\/\/www.echosenegal.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=11681"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.echosenegal.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=11681"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.echosenegal.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=11681"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}